• Home
  • Latest News
  • BICS Electricity Discount: UK Manufacturers Must Apply by 30 November

Timeline graphic: British Industrial Competitiveness Scheme (BICS) year 1. Applications opened 1 October 2026 and close at 11:59pm on 30 November 2026, decisions early 2027, RO and FiT exemption from April 2027, Capacity Market exemption from October 2027. Up to £40 per MWh, up to 25% off electricity bills, 33 MWh minimum grid use per site. Sources: GOV.UK, Make UK

UK manufacturers have just ten days left to apply for the British Industrial Competitiveness Scheme (BICS), the government’s electricity discount for industry. On 19 November, Make UK urged every eligible manufacturer to get an application in before the first-year window closes at 11:59pm on 30 November 2026, warning that there’s only one round a year and applications can’t be changed once submitted.

What BICS offers

  • Eligible manufacturing sites will be exempt from three electricity policy costs: the Renewables Obligation (RO), Feed-in Tariffs (FiT) and the Capacity Market (CM).
  • Make UK says those exemptions together could be worth up to £40 per MWh. The government has described the scheme as cutting electricity bills by up to 25%, with the actual discount depending on the price each business pays.
  • According to the GOV.UK guidance, decisions come in early 2027, the RO and FiT exemption starts in April 2027 and the Capacity Market exemption follows in October 2027.
  • The government said more than 10,000 manufacturers could be eligible when applications opened on 1 October.

Who can apply

A business must be registered at Companies House, operate in an eligible sector (set by SIC code), make eligible products (set by HS code) at a site in Great Britain, and meet a minimum level of grid electricity use, which Make UK puts at 33 MWh a year per site. You’ll need MPAN details and six months of evidence of both manufacturing activity and electricity use for each site. GOV.UK has a free eligibility checker to try first.

Make UK also points out that the criteria leave out some manufacturers who still face heavy electricity costs, and it has called for the scheme to be widened.

What it means for manufacturers and buyers of steel parts

  • Check now, not on the 30th. Gathering MPANs and six months of bills takes time, and there’s no second chance until next year’s round.
  • Energy is baked into part prices. Cutting, folding and welding all run on electricity, so lower policy costs from 2027 should help UK suppliers stay competitive against imports.
  • Relief isn’t instant. Nothing changes on bills until April 2027, so costs for the coming months stay where they are. Firm, same-day prices help you plan around that.

UK-made in Shaw, Oldham

At Kaizen Engineering we laser cut, fold and fabricate made-to-order steel, stainless and aluminium parts at our works in Shaw, Oldham, from one-offs to repeat batches, including Hardox wear parts. We offer same-day quotes and same-day laser cutting, so you get a firm price fast and your parts moving without the wait. See our laser cutting and steel fabrication services.

Send us your drawing

Email your drawing to sales@kaizen-eng.com with the material, thickness and quantity, or use our request a quote page, and we’ll come back with a price the same day.

Kaizen Engineering, Thomas Street, Shaw, Oldham OL2 8PG
Made Up North. Built to Last.

Sources

  • Make UK, “BICS: A chance for manufacturers to cut their electricity costs – make sure you don’t miss out”, 19 November 2026: makeuk.org
  • GOV.UK, “British Industrial Competitiveness Scheme: guidance for applicants”: gov.uk
  • GOV.UK, “Applications open for scheme to slash electricity bills for over 10,000 manufacturers”, 1 October 2026: gov.uk
Share this article

News Filters

Use our handy news filters to find what you’re looking for quickly. Search by keyword, category or tag.

Filter blog

Contact us

Thomas Street
Shaw
Oldham
OL28PG

01706 847 172

Call us today on 01706 847 172 or contact us here